The mass timber system is central to the project for supportive housing. By relying on columns rather than CLT shear walls, the building avoids rigid planning constraints and opens up the floor plate to a wide range of spatial configurations. This flexibility allows amenity and communal spaces to be distributed throughout the building rather than concentrated in isolated zones.

Conceived as a pilot for CreateTO, it uses a distinctly Canadian approach to modern methods of construction, pairing a mass timber structure with a high-performance prefabricated envelope. Using geoexchange heating and cooling, the project achieves net-zero carbon operations and Toronto Green Standard V4 Tier 2.